Case Study
SAWDUST FOR PELLET PRODUCTION
Ramsågsgatan 8, SE-385 34 Torsås, Sweden • +46 (0)486 456 50 • info@pst.se • www.pst.se PST CASE STUDY SAWDUST FOR PELLET PRODUCTION Our client in United Kingdom, a company very focused on sustainable production of wood products, required a viable solution for transporting sawdust to their pellet production plant, PST offered, and delive- red what they needed; a conveyor system which is able to handle up to 100m3/h of raw material. In total PST supplied 151 meter shaftless spiral con- veyors which were integrated in the client's existing process flow. One of the horizontal V-conveyors is fitted with 6 outlets, each equipped with a slide val- ve/door. The material is then portioned through the valves into different storage bins, all depending on the moisture content and density of ...